Al-3290A Floor Standing Room Air Conditioner Automatic Assembly Line Production Line

Al-3290A Floor Standing Room Air Conditioner Automatic Assembly Line Production Line

AUXIHU (WEST LAKE) DIS.NE Sequence

AL-3290A Flooring Standing Room Air Conditioner  CZPT Assembly line/Manufacturing Line

Title:AL-3290A Ground Standing Room Air Conditioner  CZPT Assembly line/Manufacturing Line
Product: AUXIHU (WEST LAKE) DIS.NE AL-3290A
Scope of application: Air conditioning indoor/out of doors unit manufacturing system

Item specifications

Collection Line Deal Dimensions (MM) Bodyweight(KG) Highest defeat
(S)
Minimum conquer (s)
Size Width Peak
Out of doors Device AW2L 937 436 705 54 123 77
Out of doors Unit AW5L 1039 484 850 sixty eight 142 90
Outdoor Device AW5L 1110 460 1200 110 159 96
Out of doors Unit AW6L 1110 460 1530 130 180 108

Merchandise Framework
1) Push on-line balance crane
2) CZPT device on-line suction crane
three) Vacuum pump
4) Vacuum line evacuation technique
five) Fluorine injection device
6) Halogen detector
7) Brine inspection place
8) CZPT inspection room
nine) CZPT inspection and tests method
10) Regular equipment
eleven) Working condition air conditioner
12) Refrigerant restoration device
13) Baler
fourteen) Box sealing device
15) CZPT stacking
sixteen) Down line suction crane
17) Pallet storehouse
eighteen) CZPTtrical handle technique
19) Lights method
twenty) Rotary desk, and so forth

Solution functions
1) Stable procedure of line physique
2) Production beat of line thirteen-35 sets / hour,
3) Line generation layout conquer: seventy seven-202s / established, adjustable
four) The wire physique products is related with the roller wire entire body, which can operate stably with out massive shaking
5) Regular or general elements
six) Substantial toughness and rigidity of all bearing parts
7) Creation line rotating elements, flexible operation, steady 24 several hours operation
8) The creation line gear can be operated in the environment of eighty five% RH, ºC ~ 40 ºC
nine) Running sound considerably less than 70dB
ten) The tools is developed in accordance with the basic principle of male-device, practical and protected operation
eleven) Secure procedure, minimal failure price and simple routine maintenance
twelve) Undertake open composition, easy to adjust types and versions and improve products technology
 

Photographs for reference
(
The pursuing pictures are from the implementation situation of Heritop)

Cooperative client
For much more than ten several years, we have been delivering competitive equipment and technological solutions to the adhering to cooperative buyers and gaining their believe in.

Our factory

HeriTop manufacturing facility is located in HangZhou substantial tech advancement Zone, ZheJiang CZPT, China,covering an region of 5000 square meters. It is equipped with parts manufacturing workshop, assembly workshop, commissioning workshop, laboratory, exhibition heart, and so forth.

 

Al-3290A Floor Standing Room Air Conditioner Automatic Assembly Line Production Line